top of page

our services

Configuration & Assembly
  • Assess equipment needs: Identify hardware and determine power, cooling, space, and connectivity requirements.

  • Design rack layout: Plan equipment placement, considering weight, airflow, and cable management.

  • Unpack equipment: Unpack carefully and check for damages or missing parts.

  • Label components: Label servers, cables, and ports for easy identification.

Testing
  • Power up equipment: Turn on each device and monitor for errors during startup.

  • Configure network settings: Set IP addresses and network settings, then test connections.

  • Update firmware: Install any firmware updates for servers and network devices.

  • Perform tests: Run basic tests to check functionality, network connectivity, and data speeds.

  • Document installation: Record equipment placement and network/power connections, and update the asset management system with new details.

Cabling
  • Plan cable routes: Map out paths for power and data cables to avoid interference and ensure airflow.

  • Connect power cables: Attach power cables to each device, routing and securing them with cable ties.

  • Connect network cables: Plug network cables into the correct ports, using color-coded cables and labels for easy identification.

  • Manage cables: Bundle and secure cables with ties or straps, keeping them neat for airflow and easy access.

Delivery
  • Pre-Transport assessment: Evaluate the servers to determine handling and packaging needs.

  • Specialized packaging: Use protective packaging materials, like anti-static bubble wrap and padded crates, to safeguard the servers.

  • Secure loading and transport: Securely load servers onto vehicles and use climate-controlled transport to protect them during the journey.

  • Tracking and monitoring: Implement real-time tracking to monitor the servers’ location and condition throughout transport.

Stacking
  • Preparation and planning: Assess the layout of the rack and plan the placement of servers based on size, weight distribution, and airflow considerations

  • Install rack rails: Attach rack rails or brackets, ensuring they are level and secure.

  • Secure mounting: Carefully lift and secure each server onto the rack, ensuring they are properly aligned and fastened to prevent movement or damage.

White Glove Service
  • Pre-Site checklist: A thorough checklist is conducted at the data center prior to delivery to confirm service details, appointment times, and any specific location requirements.

  • Tailored transportation: Our white glove services offer customized transportation solutions to ensure complete end-to-end visibility throughout the process.

  • On-Site setup: We provide on-site setup and equipment removal as part of our comprehensive white glove services.

  • Unpacking and debris removal: Our services include unpacking equipment and removing any debris, ensuring a clean and efficient setup.

Request a Quote

Phone: 801-675-8484

bottom of page