Configuration & Assembly
-
Assess equipment needs: Identify hardware and determine power, cooling, space, and connectivity requirements.
-
Design rack layout: Plan equipment placement, considering weight, airflow, and cable management.
-
Unpack equipment: Unpack carefully and check for damages or missing parts.
-
Label components: Label servers, cables, and ports for easy identification.
Testing
-
Power up equipment: Turn on each device and monitor for errors during startup.
-
Configure network settings: Set IP addresses and network settings, then test connections.
-
Update firmware: Install any firmware updates for servers and network devices.
-
Perform tests: Run basic tests to check functionality, network connectivity, and data speeds.
-
Document installation: Record equipment placement and network/power connections, and update the asset management system with new details.
Cabling
-
Plan cable routes: Map out paths for power and data cables to avoid interference and ensure airflow.
-
Connect power cables: Attach power cables to each device, routing and securing them with cable ties.
-
Connect network cables: Plug network cables into the correct ports, using color-coded cables and labels for easy identification.
-
Manage cables: Bundle and secure cables with ties or straps, keeping them neat for airflow and easy access.
Delivery
-
Pre-Transport assessment: Evaluate the servers to determine handling and packaging needs.
-
Specialized packaging: Use protective packaging materials, like anti-static bubble wrap and padded crates, to safeguard the servers.
-
Secure loading and transport: Securely load servers onto vehicles and use climate-controlled transport to protect them during the journey.
-
Tracking and monitoring: Implement real-time tracking to monitor the servers’ location and condition throughout transport.
Stacking
-
Preparation and planning: Assess the layout of the rack and plan the placement of servers based on size, weight distribution, and airflow considerations
-
Install rack rails: Attach rack rails or brackets, ensuring they are level and secure.
-
Secure mounting: Carefully lift and secure each server onto the rack, ensuring they are properly aligned and fastened to prevent movement or damage.
White Glove Service
-
Pre-Site checklist: A thorough checklist is conducted at the data center prior to delivery to confirm service details, appointment times, and any specific location requirements.
-
Tailored transportation: Our white glove services offer customized transportation solutions to ensure complete end-to-end visibility throughout the process.
-
On-Site setup: We provide on-site setup and equipment removal as part of our comprehensive white glove services.
-
Unpacking and debris removal: Our services include unpacking equipment and removing any debris, ensuring a clean and efficient setup.